|
Product Detail :
|
C/o a 70.0-meter span RCC arch bridge, including approach roads on both sides, flood protection works, and the C/o ornamental campus main entry gate with a security check post at the South Campus of IITM. In EPC mode I (Design and Build Basis) C/o a 70.0-meter span RCC arch bridge, including approach roads on both sides, flood protection works, and the C/o ornamental campus main entry gate with a security check post at the South Campus of IITM. In EPC mode I (Design and Build Basis)
|
| Tender Detail : |
C/o a 70.0-meter span RCC arch bridge, including approach roads on both sides, flood protection works, and the C/o ornamental campus main entry gate with a security check post at the South Campus of IITM. In EPC mode I (Design and Build Basis) #*. C/o a 70.0-meter span RCC arch bridge, including approach roads on both sides, flood protection works, and the C/o ornamental campus main entry gate with a security check post at the South Campus of IITM. In EPC mode I (Design and Build Basis) |