|
Product Detail :
|
Estimate of S&T Work for Rehabilitation and Up-Gradation to 4 lane configuration
& strengthening of Thanpuri to Paror section from km.85.135 to km
100.840(Design Length 16.275km) of NH-20(New NH-154) of Pathankot-Mandi
section under NH(O) in HP on EPC mode(Package-IIC)-Regarding the temporary
diversion for the proposed flyover cum ROB at Railway km.112+746.
|
| Tender Detail : |
Estimate of S&T Work for Rehabilitation and Up-Gradation to 4 lane configuration
& strengthening of Thanpuri to Paror section from km.85.135 to km
100.840(Design Length 16.275km) of NH-20(New NH-154) of Pathankot-Mandi
section under NH(O) in HP on EPC mode(Package-IIC)-Regarding the temporary
diversion for the proposed flyover cum ROB at Railway km.112+746. |