Product Detail :
|
Restoration of Shah Nehar Project. Replacement of damaged RCC pipe 250mm dia with P/L HDPPE pipe PN-4 225mm dia in between OL No. 7 to 6, O/L No. 6 to 7 and O/L No. 7 to 8-305mtr of LIS Ghandran Phase lind on RBC under SNP Sub Division, Ghandran).
|