Product Detail :
|
Construction of 148.00 mtr span double lane bridge over bakkar khad on kun to chhamb road at km 1/250. Substructure, superstructure, both side approaches and construction of both side approach road (kun side 300 mtrs and chhamb side 200 mtrs). Formation cutting 5/7 mtrs wide cross drainage work metalling and tarring, retaining walls, boundary walls, V shape drains, parapets and road sign boards.
|